Using the Generalized Maximum Covering Location Model to Control a Project’s ProgressSabeghi, N., Tareghian, H. R. (2020). Using the generalized maximum covering location model to control a project’s progress. Computational Management Science,17(1), 1.
In this study, we adapt for the first time the generalized maximum covering location model to determine the adjusting strategies such that the maximum control coverage is achieved, i.e. under the given constraints, a schedule that is globally as close to the baseline schedule as possible is obtained.