Integrated Cost, Quality, Risk and Schedule Control Through Earned Value Management (EVM)Khesal, T., Saghaei, A., Kha, M., Rahiminezhad Galankashi, M., & Soltani, R. (2019). Integrated cost, quality, risk and schedule control through earned value management (EVM). Journal of Engineering, Design & Technology, 17(1), 183-200. doi:10.1108/JEDT-07-2018-0119
Read this article that combines the priority objectives of projects with EVM.